Obviously, we still have things to fix...The toilet seat was the wrong color, need a longer drain pipe for the sink (we raised the vanity height by about 6"), need to replace the new light (it was damaged), paint the inside of the closet...among other things. If Council doesn't take too long tonight I'm moving into the cabinets.




I had to add the garage because it hasn't looked like this since March. This is a big step for the Holte household.
Saturday, September 18, 2010
WhoHoo, Lino!
Friday, September 17, 2010
Getting Closer
We have a slight gap in the bathroom remodel sequence, but you're only missing some sheetrocking and mudding, and a bit of plumbing.
As of this very minute, we are waiting for the skimcoat on the floor to dry. This morning we put on the final (2nd) coat of paint, laid the 1/4" birch overlay, and Landon just finished up skimcoating the seams and staple heads.